Kenkiyak – Kumkol Oil Pipeline, built by Goodwin Capital LLP, is intended for transportation of oil from West Kazakhstan and Aktone oilfields. The initial point is Kenkiyak CTP, terminal point is Kumpol CTP. The maximum capacity of the pipeline is 10 million tons a year, pipeline length is 794.263 km. The project includes construction of relay pump stations along the pipeline to increase oil transportation volumes.
10 million tons per year
794.2 km long
11.8 million tons of oil transported through the pipeline in 2014
